top of page

Christ Episcopal Church

Reconstruction of a Fire Damaged Hall

Redondo Beach, California


Soon after a fire severely damaged their hall, the parish contacted Vancrest to help them with preliminary costs to bring the condemned building up to current standards. After two years and several architectural changes and cost revisions, Vancrest was the contractor of choice. Work performed in-house included:

  • Demolition

  • Framing

  • DrywallWaterproofing and painting

  • Windows

Subcontracted work included:

  • Electrical

  • Plumbing and HVAC

  • Cabinetry

  • Flooring

  • Roofing




Comments


bottom of page